Define the working day
Tell us what equipment you manage, where it works, what keeps going wrong and what your team wishes it could see.
You do not need to prepare a technical specification. Start with the vehicle, equipment or asset, where it works and the information your team needs. We then map the outcome to needed data, possible hardware, existing-system integration and a project check — with suppliers coordinated around the brief.
Tell us what equipment you manage, where it works, what keeps going wrong and what your team wishes it could see.
We narrow the choice around the actual power, weather, mounting, vehicle information and platform instead of sending an unfiltered catalogue. Candidate suppliers and evidence stay separate until the project confirms the fit.
Work through the installation, transmitted information, alerts and platform output around a representative vehicle or machine so the setup reflects the operating requirement.
Check the installation, transmitted information, alerts and platform output on a representative vehicle or machine before wider use.
The manufacturer supplies documented hardware; the platform team accepts decoding, fields and access; the installer accepts wiring; the customer agrees the task, thresholds and rollout decision. LEXUNYU is not the manufacturer, platform owner or full algorithm provider; connectivity, platform/storage, installation and project-service costs stay with their responsible parties. No model, stock position, universal compatibility or test result is guaranteed before the project check.
We are an independent sourcing and validation partner in Shenzhen, not a factory. We agree the checks with you, then record the results from your sample run before a rollout decision, with responsibilities set across the customer, manufacturer, platform team and installer.
Where agreed, power up, acquire a fix, report to an agreed test server, and compare the IMEI with the label on each unit sampled.
Request the manufacturer build intended for the batch and record the version observed on the sample; shipment consistency remains a manufacturer confirmation.
Agree how a protocol or hardware change is notified before shipment and which party keeps the approved configuration record.
Request an IMEI and serial list with the goods where available, so the customer can agree how units are traced back to a batch.
12-month limited warranty from the shipment date shown on the commercial invoice, and 30-day DOA terms. Repairs are carried out by the manufacturer — the difference is that you deal with one person here rather than chasing a factory in a language and time zone that is not yours.
Send the IMEI, what the unit was installed on, what it did and what the platform saw. A photo of the wiring usually saves a round trip.
Check configuration, wiring, power, network, receiver records and the installation context before deciding whether the manufacturer should inspect the hardware.
Replacement, repair or a configuration fix. If it is our misjudgement in the selection, we say so.
We handle the manufacturer side and report back. Carriage terms and turnaround are agreed per case rather than promised as a fixed number we cannot control.
A long feature list means little if the device cannot survive the site, read the needed information or send it to the system your team uses.
Outdoor machines need hardware and mounting planned for the real exposure, not an ordinary cabin installation.
Trailers and containers need a battery plan; powered machines need the right voltage and sleep behaviour.
Machine hours, door events, temperature and fuel questions must be defined before choosing the device.
We check the server, protocol and required events before a wider rollout, not after the devices arrive.
You do not need to turn it into a technical specification. Explain the situation in everyday language: what is difficult to manage, what information is missing or what you want to improve.
For example, vehicles are hard to locate, machine hours are uncertain, or important temperature, fuel and door events are missing.
This may be location, running time, driver identity, temperature, fuel, door activity or supported data from the vehicle or machine.
Share the equipment type, working environment, available power, installation conditions and the platform your team currently uses.
Explain the result you need to confirm on real equipment before deciding whether to use the setup more widely.