Choose a project route
Keep what works, then compare an addition, replacement or second supply batch.
Add a camera view while keeping the existing viewing workflow.
Standard and HD connector paths have different camera-signal and equipment conditions. The reviewed Standard connector scope covers the US, Canada and UK, not Germany or the Netherlands; this restriction is not a claim about HD. Check the exact connector, gateway, dashcam, licence and country before choosing a path.
View project route →Check how video can be added without replacing an existing tracker or platform.
FMC125, FMC225 and FMC650 are named DualCam hosts. Check the installed port, firmware, power and media receiver. FMC920 is not named in that host relation.
View project route →A phone alert during parking needs more than a sensor name.
For C003F-CAT1, confirm the exact temperature probe, firmware and decoded platform field before setting an alert threshold.
View project route →Check which installed services must remain before considering an addition or replacement.
Compare the device, monitoring, applicable identity or immobilisation features, installation and support as separate obligations. A GPS tracker alone is not an equivalent monitored service.
View project route →Finding an asset may require a stored position, a fresh request or updates during a search.
Check battery maintenance, radio coverage and the device response while parked. Catalogue battery or module options do not establish wake-up behaviour or response time.
View project route →A new batch can be assessed without assuming all installed devices will be replaced.
Keep existing devices where appropriate and identify mandatory platform fields for the new batch. A supported-device directory does not establish every field, event, firmware or accessory.
View project route →Identify the required output before selecting equipment.
FMC650 and TachoSync form a documented route for supported tachographs. Check the exact version, connection and firmware. The documented deployment requires a registered company card and an always-available card-reading computer; a card mention alone is not authorisation evidence. Confirm the file recipient.
View project route →A missing report value does not automatically call for new equipment.
Compare the same device and time window across collected fields, stored history and report settings.
View project route →